[logseq-plugin-git:commit] 2026-01-30T08:13:46.538Z

This commit is contained in:
2026-01-30 09:13:47 +01:00
parent cfb26798ee
commit 5a5b4372e9
13 changed files with 204 additions and 163 deletions
+46 -18
View File
@@ -123,19 +123,6 @@
todoist-due:: 2026-01-31
todoist-desc:: From: posta-certificata@pec.aruba.it Received: 2026-01-09T08:52:55Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiWL7xgAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Okay, here's a synthesized description of the email content, ready for task completion: **Task Summary:** The email is a certified mail message requesting a copy of a specific document the original message containing the details of the doctoral research program. It was sent from `protocollo@pec.univaq.it` to `davide.diruscio@univaq.it`. The message is attached and includes a unique message identifier for tracking. **Recommended Actions:** 1. **Locate the Attachment:** Open the attached file (`jpec1303.20260109095235.33456.58.1.1@pec.aruba.it`) to retrieve the original message. 2. **Review the Message Content:** Carefully read the message to verify the details of the doctoral research program and identify the specific document you need. 3. **Forward the Document:** Send the retrieved message content to `davide.diruscio@univaq.it` to receive a copy of the original document. --- Would you like me to refine this further, perhaps by adding specific instructions based on the content of the email? --- Messaggio di posta certificata Il giorno 09/01/2026 alle ore 09:52:35 (+0100) il messaggio con oggetto "Dottorato di Ricerca in Ingegneria e scienze dell?informazione - XXXIX ciclo. Rinuncia Dott. Lino DI LEONARDO." è stato inviato da "protocollo@pec.uni
todoist-status:: ◼️
- [[2026-01-31]] TOSEM-2024-0255.R2 - Revised version
todoist-id:: [6fmfGvPpX7M6pCwg](https://todoist.com/showTask?id=6fmfGvPpX7M6pCwg)
todoist-project:: #📜 REVIEWS
todoist-due:: 2026-01-31
todoist-desc:: From: onbehalfof@manuscriptcentral.com Received: 2026-01-16T07:57:33Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiamtsNAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Here's a summary of the email content and the actionable task: **Task Summary:** Review the revised manuscript "Towards AI-Native Software Engineering (SE 3.0): A Vision and a Challenge Roadmap" (TOSEM-2024-0255.R2) for ACM Transactions on Software Engineering and Methodology. The review is requested within 4 weeks of January 16, 2026. The review should include identifying any missing relevant papers from the reference list, providing full bibliographic details and justification for inclusion. **Actionable Task:** **Title:** Review Revised Manuscript: Towards AI-Native Software Engineering (SE 3.0) **Description:** Review the revised manuscript "Towards AI-Native Software Engineering (SE 3.0): A Vision and a Challenge Roadmap" (TOSEM-2024-0255.R2) for ACM Transactions on Software Engineering and Methodology. **Specific Actions:** * Access the manuscript at: `https://mc.manuscriptcentral.com/tosem?URL_MASK=b1b597dfe9c0465496d480062f7af386` * Log in to the reviewer center if you are a prior reviewer, or follow instructions to access the system. * Download the paper. * Upload your report directly in the system following the provided form template. * **Identify and list any relevant papers missing from the reference list.** For each missing paper, include: * Names of all authors * Full paper title * Full journal/book title where the paper was published * Year of publication * URL link to the paper (if available) * **Provide a justification for why each suggested source should be considered, referencing specific sections of the paper if possible.** * Review referee guidelines at `https://www.acm.org/publications/policies/peer-review`. **Deadline:** * **February 13, 2026** (4 weeks from January 16, 2026) --- 16-Jan-2026 Dear Dr. Di Ruscio, Thank you for agreeing to review (within 4 weeks) the revised version of the paper submitted for possible publication to Transactions on Software Engineering and Methodology: Towards AI-Native Software Engineering
todoist-status:: ◼️
- [[2026-01-31]] Tosem-2024-0255.R2 - Revised Version
todoist-id:: [6fmfrW83479F5cfc](https://todoist.com/showTask?id=6fmfrW83479F5cfc)
todoist-project:: #📜 REVIEWS
todoist-due:: 2026-01-31
todoist-desc:: Weblink: [Outlook](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiamts0AAA%3D&exvsurl=1&viewmodel=ReadMessageItem) Email Content Summary: You are requested to review the revised version of the paper titled "Towards AI-Native Software Engineering (SE 3.0): A Vision and a Challenge Roadmap" submitted to Transactions on Software Engineering and Methodology (TOSEM) with manuscript ID TOSEM-2024-0255.R2. The review is to be completed within 4 weeks. Links to the manuscript system where you can download the paper, update your information, access previous review comments, and submit your review report are provided. Please identify missing relevant papers in the references and include comprehensive bibliographic information in your review report. For any login issues, contact atemplet@gmail.com. Referee guidelines are available at https://www.acm.org/publications/policies/peer-review. This task is assigned considering your role as Davide Di Ruscio, coordinator of the PhD in ICT program at the University of L'Aquila.
todoist-labels:: #ai-generated #ai-generated-main-task
todoist-status:: ◼️
- [[2026-01-31]] 🧠​ Review Manuscript JSSOFTWARE-D-26-00042 for The Journal of Systems & Software
todoist-id:: [6fpX24VmgpP6rVjc](https://todoist.com/showTask?id=6fpX24VmgpP6rVjc)
todoist-project:: #📜 REVIEWS
@@ -210,11 +197,6 @@
todoist-due:: 2026-01-31
todoist-desc:: From: no-reply@cineca.it Received: 2026-01-05T07:01:49Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiQFoy7AAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Okay, heres a synthesized task description based on the email content, focusing on actionable steps: **Task: Verify and Finalize PNRR Project Monitoring Data** **Objective:** Confirm and finalize the PNRR project monitoring data within the designated timeframe. **Actionable Steps:** 1. **Confirm with Rector/Office of the Head:** Remind the Subject Attuator (Rector/Office of the Head) that data for the 38th cycle of the PNRR program needs to be confirmed in the monitoring section of the scrivatory office (via the "conferma" button). This is due on January 10, 2026. 2. **Access Data via PNRR Monitoring:** Locate and access the "Visualizza dati monitoraggio" (View Monitoring Data) button in the scrivatory office. 3. **Review & Verify Data:** Examine the data presented within the "Visualizza dati monitoraggio" to ensure it accurately reflects the state of art for each PNRR investment project. 4. **Issue Tickets for Support:** If there are any operational issues or require support (“informatico”), proceed *exclusively* through opening support tickets to CINECA at: [Richiesta Supporto](https://mipa.support.cineca.it/support.php?service=dottorati-pnrr.cineca.it&cmp=66036) 5. **Confirmation:** Ensure all the information provided is accurate and meets the requirements of the PNRR program. **Note:** This task is crucial for meeting the deadline and maintaining the accuracy of the PNRR project monitoring documentation. --- Let me know if you'd like me to refine this further (e.g., add specific instructions for troubleshooting, or prioritize certain actions). --- Si ricorda al Soggetto attuatore (Rettore/Ufficio Dottorati) che entro il giorno 10/01/2026, per il 38° ciclo è necessario confermare nella sezione dei dati di monitoraggio presente nella scrivania (cliccando sul tasto "conferma") i dati precedentemente i
todoist-status:: ◼️
- [[2026-01-31]] Registrazione contratto Corsigani
todoist-id:: [6fjWHCmHqGFFvMvF](https://todoist.com/showTask?id=6fjWHCmHqGFFvMvF)
todoist-project:: #📗 Personal
todoist-due:: 2026-01-31
todoist-status:: ◼️
- [[2026-01-31]] Dottorati - PNRR: Conferma dati di monitoraggio, ciclo 39
todoist-id:: [6fh4WC6m8MJGJ5Q8](https://todoist.com/showTask?id=6fh4WC6m8MJGJ5Q8)
todoist-project:: #🎓 Services-PHDICT
@@ -260,4 +242,50 @@
todoist-project:: #✏️ PAPERS
todoist-due:: 2026-01-31
todoist-desc:: From: juri.dirocco@univaq.it Received: 2026-01-08T16:55:29Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiVbuSJAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- --- Ciao a tutti, Ecco come avevo pensato di dividere i compiti: * Introduction: Daniela, Davide, Leonardo * Motivation (and motivating example): Diego, Maria Teresa, Daniela , Davide e Leonardo, * Approach: Juri e Claudio * Evaluation: Ju
todoist-status:: ◼️
- [[2026-01-31]] FW: riunione progetto in rettorato
todoist-id:: [6frj45w7P5fM9QW8](https://todoist.com/showTask?id=6frj45w7P5fM9QW8)
todoist-project:: #Inbox
todoist-due:: 2026-01-31
todoist-desc:: [Web Link](https://outlook.office365.com/owa/?ItemID=AAkALgAAAAAAHYQDEapmEc2byACqAC%2FEWg0AjoVpQvBez0Ss5ZY2WGWEJgAIotZYVgAA&exvsurl=1&viewmodel=ReadMessageItem) Here's a task description created from the email content, suitable for Outlook, with suggested actions: --- **Task Name:** Rectorate Project Meeting: Confirm Time & Coordinate with Mario **Assigned To:** Bianchi, Giulio **Status:** Not Started **Priority:** Normal **Due Date:** [Suggest a reasonable date, e.g., "End of next business day" or "3 business days from creation"] **Reminder:** [Suggest a reminder, e.g., "1 day before Due Date"] --- **Description:** Mario Rossi has forwarded an email chain regarding an upcoming project meeting at the Rectorate. He has already accepted the proposed date but is awaiting confirmation on the exact time of the meeting. Your task is to confirm the precise time of this meeting and then coordinate with Mario to discuss preparation and logistics. **Suggested Actions to Accomplish This Task:** 1. **Review Email Chain:** Thoroughly check the forwarded email chain and any preceding messages (if available) for specific time proposals or follow-up replies from the organizers regarding the meeting time. Mario mentioned he's "chiedendo l'orario" (asking for the time), so a reply might be pending. 2. **Contact Organizer (If Needed):** If the time is not explicitly stated or confirmed within the email chain, identify the original meeting organizer(s) and send a polite follow-up email requesting the exact start and end time for the project meeting at the Rectorate. 3. **Update Calendar:** Once the meeting time is confirmed, immediately update your personal calendar (and any shared project calendars) with the full meeting details: Date, Time, and Location (Rectorate). 4. **Inform Mario:** Notify Mario Rossi as soon as the definitive meeting time is confirmed. 5. **Coordinate with Mario:** Schedule a brief follow-up call or meeting with Mario to discuss the agenda, required preparatory materials, and overall strategy for the Rectorate project meeting. He asked to be informed ("Quando sai dammi un fischio che ci sentiamo e ci organizziamo").
todoist-labels:: #outlook365
todoist-status:: ◼️
- [[2026-01-31]] Pubblicazione Decreto di rettifica dell'Avviso per la presentazione di Progetti di Ateneo per la Ricerca di Base e Avvio alla Ricerca per l'anno 2026
todoist-id:: [6ffgFx5M2VMWVhQ8](https://todoist.com/showTask?id=6ffgFx5M2VMWVhQ8)
todoist-project:: #🔭 Services-Commissione-Ricerca-DISIM
todoist-due:: 2026-01-31
todoist-desc:: From: proget@strutture.univaq.it Received: 2025-12-22T14:22:50Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiOPS6ZAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Okay, here's a synthesis of the email content, summarized and designed to be actionable, focusing on the key information and suggesting steps: **Task Summary:** The email is a formal announcement regarding the completion of a project proposal ("Avviso per la presentazione di Progetti..."). It's requesting confirmation of receipt and potentially a preliminary review. **Detailed Breakdown & Actionable Steps:** 1. **Confirmation of Receipt:** *Immediately* confirm youve received the email. If you havent, contact the sender (Luisa De Matteis) via email. 2. **Understand the Content:** The email highlights the crucial point that the project proposal ("Progetti di Ateneo") has been published and is awaiting review. The key elements are: * **Official Publication:** It was published at the Albo ufficiale di Ateneo. * **Ricerca - Finanziamenti di Ateneo:** It is related to funding and research initiatives within the Ateneo University. * **Due Diligence Required:** It's essential to review the proposal thoroughly. 3. **Recommended Actions - Initial Review & Contact:** * **Review the Proposal:** Carefully read the entire document. Understand the scope, goals, and deliverables. * **Contact the Sender (Luisa De Matteis):** Send a polite email requesting a brief overview of the proposal. Specifically state your intention to review it and any initial questions you have. Ask for a preliminary assessment of the documents completeness and relevance to your team. 4. **Specific Questions to Ask (Based on the Email's Context - these are crucial):** * What is the stated purpose/goal of the project? * What specific areas require the most attention during the review? * Are there any attachments or supplementary materials that are needed? 5. **Legal Compliance & Disclaimers:** Before proceeding, review the email for the disclaimer concerning data privacy. Ensure your actions comply with all relevant legal requirements regarding the handling of sensitive project information. 6. **Documentation:** Keep a record of your communication with Luisa De Matteis and the email itself. --- **To help me refine this further and tailor it to a specific scenario, could you tell me:** * What is the role of the recipient? (e.g., Project Manager, Researcher, Legal Counsel?) * What is the project being reviewed? (A general idea is helpful.) --- Gentilissime e gentilissimi, vi inoltriamo il Decreto di rettifica dell'Avviso per la presentazione di Progetti di Ateneo per la Ricerca di Base e Avvio alla Ricerca per l'anno 2026. Il presente documento è stato pubblicato all'Albo ufficiale di Ateneo
todoist-status:: ◼️
- [[2026-01-31]] Certificazione corsi di dottorato non presenti su ESSE3
todoist-id:: [6frGFmx63Q8xJ478](https://todoist.com/showTask?id=6frGFmx63Q8xJ478)
todoist-project:: #🎓 Services-PHDICT
todoist-due:: 2026-01-31
todoist-desc:: From: leonardo.fazzini1@graduate.univaq.it Received: 2026-01-27T15:58:11Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAih8lmlAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Here's a summary of the email and an actionable task description: **Task Title:** Ensure PhD Course Registrations are Completed on ESSE3 **Task Description:** Leonardo Fazzini, a second-year ICT PhD student, is requesting assistance with the registration of two PhD courses on the ESSE3 platform. He completed both courses during his first year: * **Research Methodology** (internal, taught by Prof. Thanh Phuong Nguyen) * **Neural Networks and Deep Learning** (external, taught by Prof. Giorgio Buttazzo at Scuola Superiore Sant'Anna) Leonardo submitted all required documentation for both courses during the transition from his first to his second year, but neither course is currently registered on ESSE3. **Recommended Actions:** * Investigate the status of the course registrations on the ESSE3 platform. * Contact the relevant administrative office or individuals responsible for ESSE3 course registration to understand the delay. * Follow up with the professors or departments involved if further information or documentation is required. * Ensure both "Research Methodology" and "Neural Networks and Deep Learning" courses are officially registered for Leonardo Fazzini on ESSE3. * Confirm with Leonardo Fazzini once the registrations are successfully completed. --- Gentili Professori Di Ruscio e Di Mascio, sono Leonardo Fazzini, dottorando in ICT al secondo anno, con supervisor Giacomo Valente e Luigi Pomante (in cc). Vi scrivo per segnalarvi una questione relativa alla registrazione dei corsi di dottorato. Nel co
todoist-status:: ◼️
- [[2026-01-31]] [[PAPERS/J-Collaborative-Development]]
todoist-id:: [6fmMjW88FQ9m8x2g](https://todoist.com/showTask?id=6fmMjW88FQ9m8x2g)
todoist-project:: #✏️ PAPERS
todoist-due:: 2026-01-31
todoist-desc:: WebLink: [Outlook](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiaRHodAAA%3D&exvsurl=1&viewmodel=ReadMessageItem)
todoist-labels:: #goal #logseqed
todoist-status:: ◼️
- [[2026-01-31]] SE4IOT Final Project Update - Team 7
todoist-id:: [6frhPXP6xcPW7gF8](https://todoist.com/showTask?id=6frhPXP6xcPW7gF8)
todoist-project:: #👨‍🏫 Teaching
todoist-due:: 2026-01-31
todoist-desc:: From: meteharun.akcay@student.univaq.it Received: 2026-01-29T10:13:50Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAii1IdqAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Okay, here's a summary of the email content, followed by actionable task recommendations: **Summary of Email Content:** The email is a follow-up to a feedback discussion regarding a Smarthouse project. It details the following: * **Implemented Updates:** The code has been updated and is available in the GitHub repository at `https://github.com/phuc-tr/smarthouse`. * **Changes Summarized:** * Room profiles are now configurable within the simulator/config.yaml. * A .env file has been added for the required environment variables. * Altering the alerting logic is now possible without Node-RED changes. * **Request for Review:** The author requests review and feedback on the updated code. * **Actionable Task Recommendation:** The author suggests reviewing the changes and notifying them about any further adjustments needed. **Actionable Task Recommendations (Todoist Task Creation):** 1. **Create a Task:** "Review Smarthouse Project Updates - GitHub" 2. **Assign Priority:** High (As this is a follow-up and requires verification) 3. **Due Date:** Ideally, within 24-48 hours (to allow for review and testing) 4. **Include Details:** Add: “Investigate the .env file configuration. Confirm the environment variable loading mechanism is working as expected." 5. **Consider:** "Check if any further configuration changes are needed in the YAML configuration files." Let me know if you'd like me to refine this further! --- Dear Professor, Following your feedback on our Smarthouse project, we implemented the requested improvements. The updated version is now available in our GitHub repository: [GitHub - phuc-tr/smarthouse](https://github.com/phuc-tr/smarthouse) The changes are summarized below: *
todoist-status:: ◼️
- [[2026-01-31]] Proposta per Univaq On Air - Dottorandi di Ricerca
todoist-id:: [6fmfWgpGcX7V285g](https://todoist.com/showTask?id=6fmfWgpGcX7V285g)
todoist-project:: #🎓 Services-PHDICT
todoist-due:: 2026-01-31
todoist-desc:: Weblink: [Outlook](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiamtsPAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) Email Content Summary: Proposal for the Univaq podcast to feature a series of interventions by research PhD students across various scientific areas and schools. The initiative aligns with the goal to narrate the life of an important and dynamic academic community. Seeking opinion and coordination for necessary steps from the coordinator of the podcast. No specific deadlines mentioned.
todoist-labels:: #ai-generated #ai-generated-main-task
todoist-status:: ◼️
- [[2026-01-31]] 🧠​ Review invitation for manuscript TOSEM-2026-0117 from ACM Transactions on Software Engineering and Methodology
todoist-id:: [6frm4F8G2vX26j5g](https://todoist.com/showTask?id=6frm4F8G2vX26j5g)
todoist-project:: #📜 REVIEWS
todoist-due:: 2026-01-31
todoist-desc:: Subject: TOSEM-2026-0117 - Invitation to Review Sender: onbehalfof@manuscriptcentral.com Weblink: [Outlook](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAii1IeVAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) Content Summary: You have been invited by the Editorial Board of ACM TOSEM to review the manuscript titled "GoLink: A Bridge for Migrating from GoPath to Go Modules in Go Ecosystem" (TOSEM-2026-0117), authored by Wang, Chao et al. The Associate Editor responsible is Dr. Damian Tamburri. Main Task: - Decide whether to accept or decline the review invitation within three working days. - If accepted, complete the review report within four weeks, or request an extension if more time is needed by emailing atemplet@gmail.com. Subtasks: 1. Respond to the invitation via the provided links to accept: [ScholarOne Manuscripts](https://mc.manuscriptcentral.com/tosem?URL_MASK=41bd4d634f7e4355bc131c252b2f2333) or decline: [ScholarOne Manuscripts](https://mc.manuscriptcentral.com/tosem?URL_MASK=8d7cd40397b842db9633ba784030a603) within three working days. 2. Download the manuscript and review guidelines after confirmation. 3. Submit the review report within four weeks from acceptance. 4. If additional time beyond four weeks is needed, request it by emailing atemplet@gmail.com. Due Date: 2026-02-26 (four weeks from 29-Jan-2026 as mentioned) Note: If you identify conflicts of interest, report them as per the reviewer responsibilities before proceeding. Editor-in-Chief: Abhik Roychoudhury
todoist-labels:: #ai-generated-main-task
todoist-status:: ◼️