external-links:: Proposal.docx - Google Docs PRIN2022 - Fairness - Google Drive type:: Project-Proposals
-
Bando PRIN 2022 PNRR
- http://s.diruscio.org/YxYAU
-
Informativa BANDO
- (http://s.diruscio.org/8a63X)
- ((637a6b28-3711-4df2-b016-40450e18361c))
- ((637a6bd4-fe71-4e39-a88c-5af0f50f7237))
- ((637a6cb1-59fe-4eb1-99a0-9a46399936c2))
-
Journal Impact factors
-
JOURNAL IMPACT FACTOR TOSEM 3.685 TSE 9.322 EMSE 3.762 JSS 3.514 IST 3.862 JSEP 1.864 STVR 1.75 SQJ 1.813 IEEE Software 3 Comm. ACM 14.065 SCICO 1.039 SPE 3.2 SOSYM 2.211 J ASE 1.677
-
-
- {{renderer :luckysheet, TOTAL IF Calculation@1668972661916}}
ACM SIGSOFT Softw. Eng. Notes (1)
Int. J. Web Eng. Technol. (1)- Last call
- (1) I opened the project on the CINECA platform. Andrea and Davide should have received the request to join the project. Please, let me know if everything is OK;
- (2) Thanks, Andrea, for drafting the expertise section in Part 3. By the next meeting, there will be a draft of the WP dependency chart and description. At the same time, I hope to be able to draft at least some of the parts included in the impact section.
- (3) I drafted the case study and assessment section - please, take a look;
- (4) Andrea and Davide, please find in the document (page 28/29) the structure of the CV requested by the platform. I copied-pasted it so that we can homogenize the content. We can discuss this point further during the next meeting, as some key pieces of information (e.g., PC chairing) do not seem to be requested; PROJECTS-PRIN-FRINGE_CV
-
Notes about the calculation of the Total IF factor
- (http://s.diruscio.org/Fy7lT)
- So it’s relatively easier than expected.. it’s the 2022 impact factor for the journals where we publish, and then we should sum it up for all our pubs regardless of their publication year
-
- DONE (5) Also, please make sure to include the description of the research unit in Section 3. Max has included already a description of UNISANNIO. We should do the same. PROJECTS-PRIN-FRINGE_RESEARCH_UNIT
- To sum up, we should be able to have an almost complete draft by one week. By the next meeting, I would kindly ask you all to double-check the technical content, refine it if needed, and include the description of your research unit, other than the CV.
- During the next meeting, we can define the final version of the budget and all other bureaucratic stuff: these pieces of information can indeed already be uploaded in the system.
- DONE Chiedere se antinisca puo partecipare
- Paper di people/antinisca collegati al progetto