[logseq-plugin-git:commit] 2026-01-15T07:59:03.395Z
This commit is contained in:
@@ -55,4 +55,27 @@
|
||||
todoist-id:: [6fjjm787rxjRMXxg](https://todoist.com/showTask?id=6fjjm787rxjRMXxg)
|
||||
todoist-project:: #Inbox
|
||||
todoist-due:: 2026-01-16
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-16]] Fare richiesta liquidazione missione
|
||||
todoist-id:: [6f8969xXrcv9xvxc](https://todoist.com/showTask?id=6f8969xXrcv9xvxc)
|
||||
todoist-project:: #✈ Missioni
|
||||
todoist-due:: 2026-01-16
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-16]] Paper con Alf
|
||||
todoist-id:: [6fmMjW88FQ9m8x2g](https://todoist.com/showTask?id=6fmMjW88FQ9m8x2g)
|
||||
todoist-project:: #✏️ PAPERS
|
||||
todoist-due:: 2026-01-16
|
||||
todoist-desc:: WebLink: [Outlook](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiaRHodAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) Email Content Summary: - Initial impression and feedback request on the draft. - Recognize lack of extensive data on case study part, no certifiable evidence available. - Suggestion to clarify the exploratory nature of data and possibly cut detailed parts accordingly. - Latex file hosted on Overleaf to be shared later. - Reference to using IEEE software standards; draft might need trimming or condensing. - Discussion about restructuring submission plans due to draft length. - Deep review and improved figures needed, specifically on asymmetry and traceability matrix analysis. - Deadline implied: review needed by weekend (from email dated 14 Jan 2026). Action Points Extracted: 1. Share Overleaf latex file. 2. Review draft for trimming or condensing. 3. Clarify exploratory nature of case study data. 4. Discuss and possibly revise submission plans based on draft length. 5. Revise and improve figures. 6. Analyze traceability matrix deeply. 7. Complete review by the weekend of 17 January 2026.
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-16]] Meeting progetti "FRINGE" e "TRex-SE" - 5-6/11 a Benevento
|
||||
todoist-id:: [6f74VXXr7f3cw9m8](https://todoist.com/showTask?id=6f74VXXr7f3cw9m8)
|
||||
todoist-project:: #✈ Missioni
|
||||
todoist-due:: 2026-01-16
|
||||
todoist-desc:: From: disorbo@unisannio.it Received: 2025-10-20T10:16:20Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAhfYToEAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Carissimi, Vi ricordo del meeting congiunto dei progetti "FRINGE" e "TRex-SE" che abbiamo schedulato per il pomeriggio del 5 Novembre e la mattina del 6 Novembre a Benevento. La location è il Polo Didattico di via delle Puglie (trovate il link a Goo
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-16]] Cybersecurity Project Final Event - Spoke 8
|
||||
todoist-id:: [6f97V5qm8xcWFFQ8](https://todoist.com/showTask?id=6f97V5qm8xcWFFQ8)
|
||||
todoist-project:: #✈ Missioni
|
||||
todoist-due:: 2026-01-16
|
||||
todoist-desc:: From: valeria.ferrari12@unibo.it Received: 2025-10-29T08:49:48Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAhk2hnFAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Buongiorno a tutti, come anticipato, a dicembre si terrà l’evento finale dello Spoke 8 del progetto SERICS. L’evento di terrà a Bologna, presso Starhotels Excelsior, in data 11 e 12 dicembre (diversamente fa quanto precedentemente comunicato, avendo
|
||||
todoist-status:: ◼️
|
||||
Reference in New Issue
Block a user