[logseq-plugin-git:commit] 2026-01-28T07:36:19.190Z
This commit is contained in:
Binary file not shown.
|
After Width: | Height: | Size: 686 KiB |
@@ -14,5 +14,6 @@ boox-notes:: 
|
||||
- 
|
||||
- 
|
||||
-
|
||||
- 
|
||||
-
|
||||
-
|
||||
+10
-102
@@ -1,45 +1,4 @@
|
||||
-
|
||||
- [[2026-01-27]] FATE - precedente DRAMA: Nuova Metodologia e Risultati
|
||||
todoist-id:: [6fW295wjFjqGj5c8](https://todoist.com/showTask?id=6fW295wjFjqGj5c8)
|
||||
todoist-project:: #✏️ PAPERS
|
||||
todoist-due:: 2026-01-27
|
||||
todoist-desc:: [https://www.overleaf.com/project/69675da0f0967462b3bd0c9d](https://www.overleaf.com/project/69675da0f0967462b3bd0c9d) [Web Link](https://outlook.office365.com/owa/?ItemID=AAkALgAAAAAAHYQDEapmEc2byACqAC%2FEWg0AjoVpQvBez0Ss5ZY2WGWEJgAIg57bhwAA&exvsurl=1&viewmodel=ReadMessageItem) Okay, here’s a task description for the email “R: Aggiornamento Paper DRAMA: Nuova Metodologia e Risultati,” crafted with actionable steps, aiming to help someone understand and complete the task: **Task Title:** Finalize & Share the DRAMA Paper Update **Description:** This task focuses on finalizing the updated DRAMA paper and ensuring it’s presented effectively to stakeholders. It involves reviewing the document, incorporating feedback, and preparing it for distribution. **Actionable Steps:** 1. **Review the Document:** Carefully read the entire updated DRAMA paper. Pay particular attention to the section regarding [Specifically mention the key section or data point the paper focuses on - e.g., methodology, results, conclusions]. 2. **Gather Feedback:** Share the document with [Assignee - specify who needs to review it - e.g., Team Lead, Senior Analyst]. Actively solicit feedback on clarity, accuracy, and completeness. 3. **Address Feedback:** Respond to each piece of feedback received. Document all changes made based on feedback. Prioritize revisions based on the severity of the feedback. 4. **Incorporate Changes:** Implement the necessary revisions to ensure the document accurately reflects the updated methodology and results. 5. **Draft a Summary/Executive Summary:** Create a concise executive summary highlighting the key takeaways, the updated methodology, and the most significant results (approximately [Specify length – e.g., 1-2 paragraphs]). 6. **Finalize & Format:** Ensure the document is properly formatted, including consistent headings, tables, figures, and citations. 7. **Prepare for Distribution:** Choose the appropriate distribution method (e.g., email, shared drive, presentation). Consider adding a brief introductory paragraph explaining the update. 8. **Proofread:** Conduct a final proofread to catch any errors before final submission. **Priority:** Medium - This task requires focused effort and attention to detail. **Due Date:** [Specify a realistic deadline – e.g., End of Day Tomorrow] **Notes:** If you have any specific areas you’d like me to focus on during the review, please let me know. --- **To help me refine this further and make it *even* better, could you tell me:** - **Who is the intended audience for this task?** (e.g., Team, Management, Clients?) - **What is the *specific* goal of the updated paper?** (e.g., present a new strategy, demonstrate improved efficiency, provide data insights?)
|
||||
todoist-labels:: #outlook365
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-27]] [Hi Professor, I just wanted to let you know that we have updated everything based on your feedback for the IoT project. The following major changes are now implemented:- The threshold values used for Telegram notifications are now fully dynamic (loaded from the config).- The Grafana dashboards update automatically whenever a new sensor or threshold is added. - All sensor units are now loaded dynamically from the config file.- The main configuration file has been moved to its own `config` directory.](https://teams.microsoft.com/l/message/19:e8e48abcf7934e2b90680ff9c1d56b99@thread.v2/1769154556182?context=%7B%22contextType%22:%22chat%22%7D)
|
||||
todoist-id:: [6fqFgJPRQHf9hcGg](https://todoist.com/showTask?id=6fqFgJPRQHf9hcGg)
|
||||
todoist-project:: #👨🏫 Teaching
|
||||
todoist-due:: 2026-01-27
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-27]] Lavorare sulle slide di WP2 per Atene
|
||||
todoist-id:: [6fqc64FQRcRjgVRG](https://todoist.com/showTask?id=6fqc64FQRcRjgVRG)
|
||||
todoist-project:: #🚀 Projects-EU-MOSAICO
|
||||
todoist-due:: 2026-01-27
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-27]] Richiesta variazione strutture estere mobilità e richiesta autorizzazioni - Giacomelli Stefano
|
||||
todoist-id:: [6fm4v9FRJ485fgv8](https://todoist.com/showTask?id=6fm4v9FRJ485fgv8)
|
||||
todoist-project:: #🎓 Services-PHDICT
|
||||
todoist-due:: 2026-01-27
|
||||
todoist-desc:: From: stefano.giacomelli@graduate.univaq.it Received: 2026-01-13T21:06:18Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiX6FQMAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- **Task Description:** Stefano Giacomelli, a PhD student in ICT, is requesting a change in his mandatory 6-month PNRR mobility program's host institution. He has secured a new host institution in Belgium (KU Leuven) and has obtained an official invitation letter. He is also providing supporting documents, including a letter detailing the reasons for the change, information on the new host institution, and his visiting proposal. Additionally, he is attaching authorization requests for the PhD program coordinator and will soon provide "commitment letters" from the new host institution. **Recommended Actions:** 1. **Review and Process Host Institution Change Request:** Evaluate the provided documentation for the change of host institution for Stefano Giacomelli's PNRR mobility. 2. **Verify Supporting Documents:** Ensure all attached documents (letter of motivation, host institution details, visiting proposal, invitation letters) are complete and accurate. 3. **Obtain Commitment Letters:** Follow up with Stefano Giacomelli to ensure timely submission of the "commitment letters" from the new host institution. 4. **Approve Coordination Request:** Review and approve the authorization requests for the PhD program coordinator. 5. **Facilitate Ministry Notification:** Transmit the approved request, including all necessary details of the new host institution, to the Ministry (MUR) via the CINECA platform as per the instructions. 6. **Confirm U-Web Mission Request:** Advise Stefano Giacomelli on the process for opening a mission request on the U-Web portal for his visiting period. 7. **Provide Additional Guidance:** Address any further questions Stefano Giacomelli may have regarding the administrative and bureaucratic procedures for his mobility. **Deadline:** * The email mentions that any variation to the initial project must be authorized by the Ministry and that this step is "very important and requires urgent action." While no specific date is given, this implies a need for prompt processing. --- Buonasera, Sono Stefano Giacomelli, dottorando DISIM ICT del XXXIX ciclo. A seguito delle informazioni ricevute mediante "Ticket - Help Point" dalla Dr.ssa Valeria Gentile, e in accordo con il mio Tutor (Prof. Fabio Graziosi) e il mio Supervisor (Prof.
|
||||
todoist-labels:: #followup
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-27]] Fwd: Decision on your submission - JSSOFTWARE-D-25-01604
|
||||
todoist-id:: [6fpXr6XWhhcQWfrc](https://todoist.com/showTask?id=6fpXr6XWhhcQWfrc)
|
||||
todoist-project:: #📧EmailsToAnswer
|
||||
todoist-due:: 2026-01-27
|
||||
todoist-desc:: From: disorbo@unisannio.it Received: 2026-01-20T09:03:13Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAidZtYrAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Here's a summary of the email content and the corresponding actionable task: **Task Summary:** The email is a rejection notification from the Journal of Systems and Software (JSS) for the submission "Examining Fairness Issues in Machine Learning-based Systems" (Ref. No.: JSSOFTWARE-D-25-01604). While the paper is rejected, the editor strongly advises resubmission after addressing the reviewers' detailed comments. The reviewers highlight significant areas for improvement in the manuscript's framing of fairness, integration of related work, methodological structure and detail (especially for the qualitative analysis), dataset selection justification, and the significance and implications of the results. The resubmitted paper will be treated as a new submission. **Actionable Task:** **Task:** Revise and Resubmit Paper to Journal of Systems and Software **Description:** The submission "Examining Fairness Issues in Machine Learning-based Systems" (Ref. No.: JSSOFTWARE-D-25-01604) has been rejected by the Journal of Systems and Software. However, the editor encourages resubmission after addressing detailed reviewer comments. Key areas for improvement include: * **Framing of Fairness:** Clearly define whether fairness is treated as a technical, socio-technical, or hybrid concern. * **Related Work:** Synthesize the literature into a coherent argument rather than an enumerative survey. * **Methodology:** * Present a unified methodological structure with clear workflows and transitions between phases. * Provide more detailed explanations for the qualitative coding process, including iteration, rater interaction, and reliance on LLM summaries. * Clarify the sequencing of methodological steps and ensure logical dependencies. * Justify dataset selection criteria and report exclusion numbers. * Ensure consistency between research questions and the role of LLMs. * Consider extending the dataset size if feasible through pre-screening. * **Results and Discussion:** * Explicitly discuss novel vs. incremental findings and align with previous empirical work. * Provide concrete examples of implications for practitioners. * Consider adding new research questions and discussions. * Clarify the rationale for using large language models. * **Overall Cohesion:** Improve the integration and cohesion across different methods employed in the study. **Recommended Actions:** 1. **Thoroughly read and understand all reviewer comments.** 2. **Develop a detailed plan to address each comment.** Categorize comments by theme (e.g., Introduction, Methodology, Results, Discussion) to facilitate systematic revision. 3. **Rewrite sections of the manuscript** based on the reviewer feedback, focusing on the identified weaknesses. 4. **Prepare a comprehensive response letter** detailing how each reviewer comment has been addressed. 5. **Ensure the resubmitted manuscript is treated as a NEW submission** but consider disclosing the original submission information and reference number. 6. **Consult empirical research guidelines** (e.g., Paul Ralph et al. 2020) for structuring the revised manuscript and methodology. 7. **Consider creating a methodological diagram** to clarify the workflow. **No Deadline:** The email does not specify a deadline for resubmission. --- Buongiorno a tutti, vi giro la mail ricevuta da JSS. Saluti, Andrea ---------- Forwarded message --------- Da: Journal of Systems and Software <em@editorialmanager.com> Date: lun 19 gen 2026 alle ore 10:59 Subject: Decision on your submission
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-27]] Podcast dottorato
|
||||
todoist-id:: [6fr3FqrHRj6PCjpc](https://todoist.com/showTask?id=6fr3FqrHRj6PCjpc)
|
||||
todoist-project:: #📧EmailsToAnswer
|
||||
todoist-due:: 2026-01-27
|
||||
todoist-desc:: From: raffaele.dambrosio@univaq.it Received: 2026-01-26T11:24:01Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAihJn73AAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- **Task:** Suggest guests for the PhD podcast. **Description:** Raffaele is organizing a podcast series about PhD programs and is looking for guests. He has received suggestions from other program coordinators, but he specifically needs recommendations for guests for the PhD in Computer Science. The aim is to showcase diverse stories, including PhD holders working in academia, outside academia, current PhD students, and colleagues. **Actions to take:** 1. Identify potential guests for the PhD in Computer Science podcast, ensuring a variety of backgrounds and experiences. 2. Compile a list of these individuals and their relevant affiliations/roles. 3. Submit the suggestions to Raffaele. **Deadline:** None mentioned in the email. --- Caro Davide spero che ogni cosa proceda al meglio per te. Ti scrivo in merito al podcast sul dottorato. Come hai potuto evincere dal carteggio con tutti i coordinatori di programmi di dottorato ad UnivAQ, sono state segnalate alcune persone (dottora
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-27]] Finalizzare Verbale ultimo Collegio
|
||||
todoist-id:: [6fr6MGrcrjRmjwP9](https://todoist.com/showTask?id=6fr6MGrcrjRmjwP9)
|
||||
todoist-project:: #🎓 Services-PHDICT
|
||||
todoist-due:: 2026-01-27
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-27]] Fate checkin online
|
||||
todoist-id:: [9955946723](https://todoist.com/showTask?id=9955946723)
|
||||
todoist-project:: #Inbox
|
||||
@@ -70,64 +29,13 @@
|
||||
todoist-project:: #Inbox
|
||||
todoist-completed:: [[2026-01-27]]
|
||||
todoist-status:: ✅
|
||||
- [[2026-01-27]] fra le università straniere va aggiunta la Aalborg University che ha ospitato Roberta di Fonzo e con cui abbiamo alcune pubblicazioni, anche su IEEE Transactions on Industrial Informatics e on Industry Applications il dottorando Noman Liaqat andrà pres...
|
||||
todoist-id:: [6fG9FrXwcrvMxhp8](https://todoist.com/showTask?id=6fG9FrXwcrvMxhp8)
|
||||
todoist-project:: #🎓 Services-PHDICT
|
||||
todoist-due:: 2026-01-27
|
||||
todoist-desc:: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAhp9tawAAA%3D&exvsurl=1&viewmodel=ReadMessageItem)
|
||||
todoist-labels:: #outlook365
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-27]] SW-2025-10-0161.R1 - Maor Revision Received
|
||||
todoist-id:: [6fqHgMhJp4pq3pmg](https://todoist.com/showTask?id=6fqHgMhJp4pq3pmg)
|
||||
todoist-project:: #💺 EditoringChairing
|
||||
todoist-due:: 2026-01-27
|
||||
todoist-desc:: From: onbehalfof@manuscriptcentral.com Received: 2026-01-23T14:10:29Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAifdGzcAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- **Task Description:** Major revision for the manuscript "Explainer Pattern – A Design Pattern for the Integration of Explanations in Code" (SW-2025-10-0161.R1) has been submitted to IEEE Software. Reviewers have been invited, and you will be notified once all re-reviews are received. **Recommended Actions:** * **Wait for Notification:** Await notification from IEEE Software regarding the completion of the re-review process. * **Review and Recommend:** Once notified, access the revised manuscript and provide your recommendation. **Deadline:** * **Implicit Deadline:** The submission of re-reviews by reviewers will trigger a notification. While no explicit date is given for your action, the process is dependent on reviewer responses. --- SW-2025-10-0161.R1, "Explainer Pattern – A Design Pattern for the Integration of Explanations in Code" Manuscript Type: Regular IEEE Software 23-Jan-2026 Dear Prof. Davide Di Ruscio, The major revision for the above-referenced manuscript has be
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-27]] Manuscript ID SOSYM-26-00005495 is now in your Editor Center
|
||||
todoist-id:: [6fqqJqV6XmqFHJVg](https://todoist.com/showTask?id=6fqqJqV6XmqFHJVg)
|
||||
todoist-project:: #💺 EditoringChairing
|
||||
todoist-due:: 2026-01-27
|
||||
todoist-desc:: From: onbehalfof@manuscriptcentral.com Received: 2026-01-25T14:55:25Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAihJn7SAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- ## Task Summary: Reviewer Assignment for Manuscript SOSYM-26-00005495 A manuscript titled "Integrating Pretrained Large Language Models and Graph Neural Networks For Model-Driven Engineering: A Graph Language Modeling Framework" (ID SOSYM-26-00005495) has been submitted to the journal Software and Systems Modeling. Professor Davide Di Ruscio is requested to assign reviewers for this manuscript. ## Actionable Task for Professor Davide Di Ruscio: **Task Title:** Assign Reviewers for Manuscript SOSYM-26-00005495 **Description:** Assign appropriate reviewers for the submitted manuscript SOSYM-26-00005495. **Key Actions:** 1. **Login:** Access the journal's editorial system at `https://mc.manuscriptcentral.com/sosym` using your credentials (User ID: `davide.diruscio@univaq.it`). 2. **Navigate:** Go to your "Editor Center". 3. **Locate Manuscript:** Click on "Awaiting Reviewer Selection" and then click "Take Action" for manuscript SOSYM-26-00005495. 4. **Search & Select Reviewers:** Utilize the quick or advanced search fields to find suitable reviewers. Select reviewers using the checkboxes and click "Add". 5. **Create New Reviewers (Optional):** If necessary, create new reviewer accounts, ensuring no duplicates. 6. **Invite Reviewers:** Press the "Invite" button in the "Reviewer List". 7. **Edit & Send Invitation:** Edit the invitation message as desired and then press "Save and Send". 8. **Monitor Review Quality:** Be vigilant about the quality of reviews provided, considering the potential misuse of Generative AI. 9. **Consult Guidelines:** Refer to the Editor guidelines at `http://www.sosym.org/editor_guidelines/` for additional information. **Deadline:** As soon as possible. --- 25-Jan-2026 Dear Professor Davide Di Ruscio: Manuscript ID SOSYM-26-00005495 entitled "Integrating Pretrained Large Language Models and Graph Neural Networks For Model-Driven Engineering: A Graph Language Modeling Framework," with Professor Bork as
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-27]] [Buongiorno Prof. Dovrei aver concluso il progetto con lo sviluppo dei 4 punti che ci siamo detti sopra durante l'esame. Spiego di seguito: un container per ogni componente: Ogni componente logico (Monitor, Analyzer, Planner, Executor, Knowledge Base) è eseguito in un container Docker dedicato e isolato, garantendo modularità, ognuno con le sue dipendenze. estensibilità rispetto a sensori vs attuatori: ho superato la logica hardcoded come ci eravamo detti in riferimento alla slide 06_Slides-Control-Systems-v2.pdf implementando una gestione basata su Control Loops configurabili. Il sistema ora non conosce a priori le regole, ma istanzia dinamicamente i loop (es. Hydration Loop, Safety Loop) leggendoli dalla configurazione. Questo garantisce la totale estensibilità rispetto a nuovi sensori o nuove regole di adattamento senza ricompilare il codice. configurazione con un container dedicato: ho implementato un container dedicato (config-server) che agisce come Single Source of Truth, iniettando le policy di adattamento e la topologia a runtime. documentazione: È allegato il report PDF strutturato secondo il template fornito, completo di tassonomia dell'adattamento, logica formale e validazione visiva degli scenari tramite Dashboard Grafana.Ho inserito tutto nel repo https://github.com/ocraton/smart-olive-grove](https://teams.microsoft.com/l/message/19:afb6a496-7b16-4b74-8c53-1cd450e586f9_c2787b22-cc39-410e-a383-56cbdb9b69c9@unq.gbl.spaces/1769424079721?context=%7B%22contextType%22:%22chat%22%7D)
|
||||
todoist-id:: [6fr34W536H4grP9g](https://todoist.com/showTask?id=6fr34W536H4grP9g)
|
||||
todoist-project:: #👨🏫 Teaching
|
||||
todoist-due:: 2026-01-27
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-27]] Read: Assessing and Advancing Benchmarks for Evaluating Large Language Models in Software Engineering Tasks (Xing Hu, Feifei Niu, Junkai Chen, Xin Zhou, Junwei Zhang, Junda He, Xin Xia, David Lo) [2026]
|
||||
todoist-id:: [6fmPJm48cHFRGx5g](https://todoist.com/showTask?id=6fmPJm48cHFRGx5g)
|
||||
todoist-project:: #🚀 Projects-EU-MOSAICO
|
||||
todoist-due:: 2026-01-27
|
||||
todoist-desc:: Zotero item: zotero://select/items/UCR492ZE
|
||||
todoist-labels:: #zotero
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-27]] Fare aggiornamento calendario prossimi appelli SE4AS e SE4AIOT
|
||||
todoist-id:: [6fqFP6Vx6g6xPmx7](https://todoist.com/showTask?id=6fqFP6Vx6g6xPmx7)
|
||||
todoist-project:: #👨🏫 Teaching
|
||||
todoist-due:: 2026-01-27
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-27]] [I have compiled the expenses for the Amsterdam mission, finally . They are totaling to 2991. Please let me know if I can proceed with the Refund Request? Thanks](https://teams.microsoft.com/l/message/19:7983c74e-d43a-4a18-b65d-02c7b2d132e8_c2787b22-cc39-410e-a383-56cbdb9b69c9@unq.gbl.spaces/1766400118847?context=%7B%22contextType%22:%22chat%22%7D)
|
||||
todoist-id:: [6fXq8F8cC4Q6JFVg](https://todoist.com/showTask?id=6fXq8F8cC4Q6JFVg)
|
||||
todoist-project:: #🎓 Services-PHDICT
|
||||
todoist-due:: 2026-01-27
|
||||
todoist-labels:: #followup
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-27]] [Dottorato PNRR] Relazione annuale di sintesi
|
||||
todoist-id:: [6fj3mhqW972xv5c8](https://todoist.com/showTask?id=6fj3mhqW972xv5c8)
|
||||
todoist-project:: #🎓 Services-PHDICT
|
||||
todoist-due:: 2026-01-27
|
||||
todoist-desc:: From: alessandra.galassi@graduate.univaq.it Received: 2026-01-09T11:04:30Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiWL7x2AAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Okay, here’s a synthesized summary of the email, broken down into actionable tasks, based on the content: **Task Summary:** The email is a formal message from a "Chiar.mo Coordinatore del corso dottorale in ICT prof. Di Ruscio" (Coordination Officer for the PhD in ICT Professor Di Ruscio) to the recipient. The recipient is being sent a completed and signed form outlining a course. **Actionable Tasks:** 1. **Review and Confirm Completeness:** Carefully read the completed and signed form to ensure all required information is accurately present. 2. **Attach the Form:** Attach the completed form to this email. 3. **Send the Form:** Send the attached form to the recipient. 4. **Express Good Wishes:** Compose a polite and cordial message to the recipient, wishing them a happy New Year. 5. **Verify Sender Information:** Ensure the email is sent from a valid and trusted source. Let me know if you'd like me to elaborate on any of these points or add more detail! --- Chiar.mo Coordinatore del corso dottorale in ICT prof. Di Ruscio, come da guida utente, in allegato, invio compilata e firmata quanto specificato in oggetto. Grazie. L’occasione è gradita per porgere i migliori auguri di buon anno! Un saluto cordiale,
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-27]] Proposta per Univaq On Air - Dottorandi di Ricerca
|
||||
todoist-id:: [6fmfWgpGcX7V285g](https://todoist.com/showTask?id=6fmfWgpGcX7V285g)
|
||||
todoist-project:: #🎓 Services-PHDICT
|
||||
todoist-due:: 2026-01-27
|
||||
todoist-desc:: Weblink: [Outlook](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiamtsPAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) Email Content Summary: Proposal for the Univaq podcast to feature a series of interventions by research PhD students across various scientific areas and schools. The initiative aligns with the goal to narrate the life of an important and dynamic academic community. Seeking opinion and coordination for necessary steps from the coordinator of the podcast. No specific deadlines mentioned.
|
||||
todoist-labels:: #ai-generated #ai-generated-main-task
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-27]] CM3 WP3 Presentation
|
||||
todoist-id:: [6fm2PPccRPhRH7Qc](https://todoist.com/showTask?id=6fm2PPccRPhRH7Qc)
|
||||
todoist-project:: #📧EmailsToAnswer
|
||||
todoist-due:: 2026-01-27
|
||||
todoist-desc:: From: massimo.tisi@imt-atlantique.fr Received: 2026-01-13T09:17:46Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiX6FPlAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Here's a summary of the email content and the corresponding actionable task: **Email Summary:** The email informs Davide and Claudio that a presentation for WP3 at CM3 is being prepared. The first part of this presentation will cover sections of the final D3.1 report that were not presented at CM2. They are invited to directly edit the relevant slides to include their contributions. **Task Description:** Prepare presentation slides for WP3 at CM3, specifically focusing on sections of the D3.1 report that were not previously presented at CM2. **Recommended Actions:** * **Review the D3.1 report:** Identify sections that were not presented at CM2. * **Access the shared presentation:** Open the Google Slides presentation at the provided link: [MOSAICO CM3 WP3 v0.1.pptx](https://docs.google.com/presentation/d/1NXpe1gXgxLHcP4aURwe9TfeluKijEgdu/edit?usp=sharing&ouid=108650775882352561919&rtpof=true&sd=true) * **Edit slides:** Directly add or modify content on the relevant slides to include the unpresented sections of D3.1. * **Collaborate:** Coordinate with other team members to ensure smooth integration of content. **Deadline:** No specific deadline is mentioned in the email. --- Dear Davide, Claudio, We are preparing the presentation for WP3 at the CM3. In the first part of the presentation we describe the parts of the final D3.1 that were not already presented at the CM2. If you want to present something about the first se
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-27]] Lavorare sulle slide di WP2 per Atene
|
||||
todoist-id:: [9949614774](https://todoist.com/showTask?id=9949614774)
|
||||
todoist-project:: #Inbox
|
||||
todoist-completed:: [[2026-01-27]]
|
||||
todoist-status:: ✅
|
||||
- [[2026-01-27]] valigia
|
||||
todoist-id:: [9956941215](https://todoist.com/showTask?id=9956941215)
|
||||
todoist-project:: #Inbox
|
||||
todoist-completed:: [[2026-01-27]]
|
||||
todoist-status:: ✅
|
||||
@@ -1,11 +1,4 @@
|
||||
-
|
||||
- [[2026-01-28]] [[TOOL DEMO TRACK - MODELS 2026 Organizing Committee]]
|
||||
todoist-id:: [6fQ7HCGxPvcHGHgg](https://todoist.com/showTask?id=6fQ7HCGxPvcHGHgg)
|
||||
todoist-project:: #💺 EditoringChairing
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-desc:: From: lolaburgueno@uma.es
|
||||
todoist-labels:: #goal #logseqed
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] Contattare studenti restituzione portatili
|
||||
todoist-id:: [6f82x4WFg69Jmr99](https://todoist.com/showTask?id=6f82x4WFg69Jmr99)
|
||||
todoist-project:: #🎓 Services-PHDICT
|
||||
@@ -67,4 +60,112 @@
|
||||
todoist-project:: #🎓 Services-PHDICT
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-desc:: From: dot@strutture.univaq.it Received: 2026-01-22T09:36:00Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAievxHLAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- The email transmits a note with protocol number 10497 dated January 22, 2026, regarding a specific subject. **Task:** Forward note prot. n. 10497 of 22/01/2026. **Recommended Actions:** * Access the email content and locate the attached or referenced note. * Forward the note to the relevant individuals or departments. * Ensure proper documentation or logging of the forwarding action, if required. **Deadline:** January 22, 2026. --- Trasmettiamo la nota prot. n. 10497 del 22/01/2026 relativa all'oggetto.. Cordiali saluti Simonetta Ricciardi Università degli Studi dell'Aquila Settore Dottorati, Assegni e Borse di Ricerca Palazzo Camponeschi Piazza Santa Margherita, 2 Te
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] fra le università straniere va aggiunta la Aalborg University che ha ospitato Roberta di Fonzo e con cui abbiamo alcune pubblicazioni, anche su IEEE Transactions on Industrial Informatics e on Industry Applications il dottorando Noman Liaqat andrà pres...
|
||||
todoist-id:: [6fG9FrXwcrvMxhp8](https://todoist.com/showTask?id=6fG9FrXwcrvMxhp8)
|
||||
todoist-project:: #🎓 Services-PHDICT
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-desc:: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAhp9tawAAA%3D&exvsurl=1&viewmodel=ReadMessageItem)
|
||||
todoist-labels:: #outlook365
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] SW-2025-10-0161.R1 - Maor Revision Received
|
||||
todoist-id:: [6fqHgMhJp4pq3pmg](https://todoist.com/showTask?id=6fqHgMhJp4pq3pmg)
|
||||
todoist-project:: #💺 EditoringChairing
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-desc:: From: onbehalfof@manuscriptcentral.com Received: 2026-01-23T14:10:29Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAifdGzcAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- **Task Description:** Major revision for the manuscript "Explainer Pattern – A Design Pattern for the Integration of Explanations in Code" (SW-2025-10-0161.R1) has been submitted to IEEE Software. Reviewers have been invited, and you will be notified once all re-reviews are received. **Recommended Actions:** * **Wait for Notification:** Await notification from IEEE Software regarding the completion of the re-review process. * **Review and Recommend:** Once notified, access the revised manuscript and provide your recommendation. **Deadline:** * **Implicit Deadline:** The submission of re-reviews by reviewers will trigger a notification. While no explicit date is given for your action, the process is dependent on reviewer responses. --- SW-2025-10-0161.R1, "Explainer Pattern – A Design Pattern for the Integration of Explanations in Code" Manuscript Type: Regular IEEE Software 23-Jan-2026 Dear Prof. Davide Di Ruscio, The major revision for the above-referenced manuscript has be
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] Manuscript ID SOSYM-26-00005495 is now in your Editor Center
|
||||
todoist-id:: [6fqqJqV6XmqFHJVg](https://todoist.com/showTask?id=6fqqJqV6XmqFHJVg)
|
||||
todoist-project:: #💺 EditoringChairing
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-desc:: From: onbehalfof@manuscriptcentral.com Received: 2026-01-25T14:55:25Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAihJn7SAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- ## Task Summary: Reviewer Assignment for Manuscript SOSYM-26-00005495 A manuscript titled "Integrating Pretrained Large Language Models and Graph Neural Networks For Model-Driven Engineering: A Graph Language Modeling Framework" (ID SOSYM-26-00005495) has been submitted to the journal Software and Systems Modeling. Professor Davide Di Ruscio is requested to assign reviewers for this manuscript. ## Actionable Task for Professor Davide Di Ruscio: **Task Title:** Assign Reviewers for Manuscript SOSYM-26-00005495 **Description:** Assign appropriate reviewers for the submitted manuscript SOSYM-26-00005495. **Key Actions:** 1. **Login:** Access the journal's editorial system at `https://mc.manuscriptcentral.com/sosym` using your credentials (User ID: `davide.diruscio@univaq.it`). 2. **Navigate:** Go to your "Editor Center". 3. **Locate Manuscript:** Click on "Awaiting Reviewer Selection" and then click "Take Action" for manuscript SOSYM-26-00005495. 4. **Search & Select Reviewers:** Utilize the quick or advanced search fields to find suitable reviewers. Select reviewers using the checkboxes and click "Add". 5. **Create New Reviewers (Optional):** If necessary, create new reviewer accounts, ensuring no duplicates. 6. **Invite Reviewers:** Press the "Invite" button in the "Reviewer List". 7. **Edit & Send Invitation:** Edit the invitation message as desired and then press "Save and Send". 8. **Monitor Review Quality:** Be vigilant about the quality of reviews provided, considering the potential misuse of Generative AI. 9. **Consult Guidelines:** Refer to the Editor guidelines at `http://www.sosym.org/editor_guidelines/` for additional information. **Deadline:** As soon as possible. --- 25-Jan-2026 Dear Professor Davide Di Ruscio: Manuscript ID SOSYM-26-00005495 entitled "Integrating Pretrained Large Language Models and Graph Neural Networks For Model-Driven Engineering: A Graph Language Modeling Framework," with Professor Bork as
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] [Buongiorno Prof. Dovrei aver concluso il progetto con lo sviluppo dei 4 punti che ci siamo detti sopra durante l'esame. Spiego di seguito: un container per ogni componente: Ogni componente logico (Monitor, Analyzer, Planner, Executor, Knowledge Base) è eseguito in un container Docker dedicato e isolato, garantendo modularità, ognuno con le sue dipendenze. estensibilità rispetto a sensori vs attuatori: ho superato la logica hardcoded come ci eravamo detti in riferimento alla slide 06_Slides-Control-Systems-v2.pdf implementando una gestione basata su Control Loops configurabili. Il sistema ora non conosce a priori le regole, ma istanzia dinamicamente i loop (es. Hydration Loop, Safety Loop) leggendoli dalla configurazione. Questo garantisce la totale estensibilità rispetto a nuovi sensori o nuove regole di adattamento senza ricompilare il codice. configurazione con un container dedicato: ho implementato un container dedicato (config-server) che agisce come Single Source of Truth, iniettando le policy di adattamento e la topologia a runtime. documentazione: È allegato il report PDF strutturato secondo il template fornito, completo di tassonomia dell'adattamento, logica formale e validazione visiva degli scenari tramite Dashboard Grafana.Ho inserito tutto nel repo https://github.com/ocraton/smart-olive-grove](https://teams.microsoft.com/l/message/19:afb6a496-7b16-4b74-8c53-1cd450e586f9_c2787b22-cc39-410e-a383-56cbdb9b69c9@unq.gbl.spaces/1769424079721?context=%7B%22contextType%22:%22chat%22%7D)
|
||||
todoist-id:: [6fr34W536H4grP9g](https://todoist.com/showTask?id=6fr34W536H4grP9g)
|
||||
todoist-project:: #👨🏫 Teaching
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] Read: Assessing and Advancing Benchmarks for Evaluating Large Language Models in Software Engineering Tasks (Xing Hu, Feifei Niu, Junkai Chen, Xin Zhou, Junwei Zhang, Junda He, Xin Xia, David Lo) [2026]
|
||||
todoist-id:: [6fmPJm48cHFRGx5g](https://todoist.com/showTask?id=6fmPJm48cHFRGx5g)
|
||||
todoist-project:: #🚀 Projects-EU-MOSAICO
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-desc:: Zotero item: zotero://select/items/UCR492ZE
|
||||
todoist-labels:: #zotero
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] Fare aggiornamento calendario prossimi appelli SE4AS e SE4AIOT
|
||||
todoist-id:: [6fqFP6Vx6g6xPmx7](https://todoist.com/showTask?id=6fqFP6Vx6g6xPmx7)
|
||||
todoist-project:: #👨🏫 Teaching
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] [Hi Professor, I just wanted to let you know that we have updated everything based on your feedback for the IoT project. The following major changes are now implemented:- The threshold values used for Telegram notifications are now fully dynamic (loaded from the config).- The Grafana dashboards update automatically whenever a new sensor or threshold is added. - All sensor units are now loaded dynamically from the config file.- The main configuration file has been moved to its own `config` directory.](https://teams.microsoft.com/l/message/19:e8e48abcf7934e2b90680ff9c1d56b99@thread.v2/1769154556182?context=%7B%22contextType%22:%22chat%22%7D)
|
||||
todoist-id:: [6fqFgJPRQHf9hcGg](https://todoist.com/showTask?id=6fqFgJPRQHf9hcGg)
|
||||
todoist-project:: #👨🏫 Teaching
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] [I have compiled the expenses for the Amsterdam mission, finally . They are totaling to 2991. Please let me know if I can proceed with the Refund Request? Thanks](https://teams.microsoft.com/l/message/19:7983c74e-d43a-4a18-b65d-02c7b2d132e8_c2787b22-cc39-410e-a383-56cbdb9b69c9@unq.gbl.spaces/1766400118847?context=%7B%22contextType%22:%22chat%22%7D)
|
||||
todoist-id:: [6fXq8F8cC4Q6JFVg](https://todoist.com/showTask?id=6fXq8F8cC4Q6JFVg)
|
||||
todoist-project:: #🎓 Services-PHDICT
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-labels:: #followup
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] [Dottorato PNRR] Relazione annuale di sintesi
|
||||
todoist-id:: [6fj3mhqW972xv5c8](https://todoist.com/showTask?id=6fj3mhqW972xv5c8)
|
||||
todoist-project:: #🎓 Services-PHDICT
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-desc:: From: alessandra.galassi@graduate.univaq.it Received: 2026-01-09T11:04:30Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiWL7x2AAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Okay, here’s a synthesized summary of the email, broken down into actionable tasks, based on the content: **Task Summary:** The email is a formal message from a "Chiar.mo Coordinatore del corso dottorale in ICT prof. Di Ruscio" (Coordination Officer for the PhD in ICT Professor Di Ruscio) to the recipient. The recipient is being sent a completed and signed form outlining a course. **Actionable Tasks:** 1. **Review and Confirm Completeness:** Carefully read the completed and signed form to ensure all required information is accurately present. 2. **Attach the Form:** Attach the completed form to this email. 3. **Send the Form:** Send the attached form to the recipient. 4. **Express Good Wishes:** Compose a polite and cordial message to the recipient, wishing them a happy New Year. 5. **Verify Sender Information:** Ensure the email is sent from a valid and trusted source. Let me know if you'd like me to elaborate on any of these points or add more detail! --- Chiar.mo Coordinatore del corso dottorale in ICT prof. Di Ruscio, come da guida utente, in allegato, invio compilata e firmata quanto specificato in oggetto. Grazie. L’occasione è gradita per porgere i migliori auguri di buon anno! Un saluto cordiale,
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] Richiesta variazione strutture estere mobilità e richiesta autorizzazioni - Giacomelli Stefano
|
||||
todoist-id:: [6fm4v9FRJ485fgv8](https://todoist.com/showTask?id=6fm4v9FRJ485fgv8)
|
||||
todoist-project:: #🎓 Services-PHDICT
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-desc:: From: stefano.giacomelli@graduate.univaq.it Received: 2026-01-13T21:06:18Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiX6FQMAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- **Task Description:** Stefano Giacomelli, a PhD student in ICT, is requesting a change in his mandatory 6-month PNRR mobility program's host institution. He has secured a new host institution in Belgium (KU Leuven) and has obtained an official invitation letter. He is also providing supporting documents, including a letter detailing the reasons for the change, information on the new host institution, and his visiting proposal. Additionally, he is attaching authorization requests for the PhD program coordinator and will soon provide "commitment letters" from the new host institution. **Recommended Actions:** 1. **Review and Process Host Institution Change Request:** Evaluate the provided documentation for the change of host institution for Stefano Giacomelli's PNRR mobility. 2. **Verify Supporting Documents:** Ensure all attached documents (letter of motivation, host institution details, visiting proposal, invitation letters) are complete and accurate. 3. **Obtain Commitment Letters:** Follow up with Stefano Giacomelli to ensure timely submission of the "commitment letters" from the new host institution. 4. **Approve Coordination Request:** Review and approve the authorization requests for the PhD program coordinator. 5. **Facilitate Ministry Notification:** Transmit the approved request, including all necessary details of the new host institution, to the Ministry (MUR) via the CINECA platform as per the instructions. 6. **Confirm U-Web Mission Request:** Advise Stefano Giacomelli on the process for opening a mission request on the U-Web portal for his visiting period. 7. **Provide Additional Guidance:** Address any further questions Stefano Giacomelli may have regarding the administrative and bureaucratic procedures for his mobility. **Deadline:** * The email mentions that any variation to the initial project must be authorized by the Ministry and that this step is "very important and requires urgent action." While no specific date is given, this implies a need for prompt processing. --- Buonasera, Sono Stefano Giacomelli, dottorando DISIM ICT del XXXIX ciclo. A seguito delle informazioni ricevute mediante "Ticket - Help Point" dalla Dr.ssa Valeria Gentile, e in accordo con il mio Tutor (Prof. Fabio Graziosi) e il mio Supervisor (Prof.
|
||||
todoist-labels:: #followup
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] Proposta per Univaq On Air - Dottorandi di Ricerca
|
||||
todoist-id:: [6fmfWgpGcX7V285g](https://todoist.com/showTask?id=6fmfWgpGcX7V285g)
|
||||
todoist-project:: #🎓 Services-PHDICT
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-desc:: Weblink: [Outlook](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiamtsPAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) Email Content Summary: Proposal for the Univaq podcast to feature a series of interventions by research PhD students across various scientific areas and schools. The initiative aligns with the goal to narrate the life of an important and dynamic academic community. Seeking opinion and coordination for necessary steps from the coordinator of the podcast. No specific deadlines mentioned.
|
||||
todoist-labels:: #ai-generated #ai-generated-main-task
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] Finalizzare Verbale ultimo Collegio
|
||||
todoist-id:: [6fr6MGrcrjRmjwP9](https://todoist.com/showTask?id=6fr6MGrcrjRmjwP9)
|
||||
todoist-project:: #🎓 Services-PHDICT
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] CM3 WP3 Presentation
|
||||
todoist-id:: [6fm2PPccRPhRH7Qc](https://todoist.com/showTask?id=6fm2PPccRPhRH7Qc)
|
||||
todoist-project:: #📧EmailsToAnswer
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-desc:: From: massimo.tisi@imt-atlantique.fr Received: 2026-01-13T09:17:46Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiX6FPlAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Here's a summary of the email content and the corresponding actionable task: **Email Summary:** The email informs Davide and Claudio that a presentation for WP3 at CM3 is being prepared. The first part of this presentation will cover sections of the final D3.1 report that were not presented at CM2. They are invited to directly edit the relevant slides to include their contributions. **Task Description:** Prepare presentation slides for WP3 at CM3, specifically focusing on sections of the D3.1 report that were not previously presented at CM2. **Recommended Actions:** * **Review the D3.1 report:** Identify sections that were not presented at CM2. * **Access the shared presentation:** Open the Google Slides presentation at the provided link: [MOSAICO CM3 WP3 v0.1.pptx](https://docs.google.com/presentation/d/1NXpe1gXgxLHcP4aURwe9TfeluKijEgdu/edit?usp=sharing&ouid=108650775882352561919&rtpof=true&sd=true) * **Edit slides:** Directly add or modify content on the relevant slides to include the unpresented sections of D3.1. * **Collaborate:** Coordinate with other team members to ensure smooth integration of content. **Deadline:** No specific deadline is mentioned in the email. --- Dear Davide, Claudio, We are preparing the presentation for WP3 at the CM3. In the first part of the presentation we describe the parts of the final D3.1 that were not already presented at the CM2. If you want to present something about the first se
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] Fwd: Decision on your submission - JSSOFTWARE-D-25-01604
|
||||
todoist-id:: [6fpXr6XWhhcQWfrc](https://todoist.com/showTask?id=6fpXr6XWhhcQWfrc)
|
||||
todoist-project:: #📧EmailsToAnswer
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-desc:: From: disorbo@unisannio.it Received: 2026-01-20T09:03:13Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAidZtYrAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Here's a summary of the email content and the corresponding actionable task: **Task Summary:** The email is a rejection notification from the Journal of Systems and Software (JSS) for the submission "Examining Fairness Issues in Machine Learning-based Systems" (Ref. No.: JSSOFTWARE-D-25-01604). While the paper is rejected, the editor strongly advises resubmission after addressing the reviewers' detailed comments. The reviewers highlight significant areas for improvement in the manuscript's framing of fairness, integration of related work, methodological structure and detail (especially for the qualitative analysis), dataset selection justification, and the significance and implications of the results. The resubmitted paper will be treated as a new submission. **Actionable Task:** **Task:** Revise and Resubmit Paper to Journal of Systems and Software **Description:** The submission "Examining Fairness Issues in Machine Learning-based Systems" (Ref. No.: JSSOFTWARE-D-25-01604) has been rejected by the Journal of Systems and Software. However, the editor encourages resubmission after addressing detailed reviewer comments. Key areas for improvement include: * **Framing of Fairness:** Clearly define whether fairness is treated as a technical, socio-technical, or hybrid concern. * **Related Work:** Synthesize the literature into a coherent argument rather than an enumerative survey. * **Methodology:** * Present a unified methodological structure with clear workflows and transitions between phases. * Provide more detailed explanations for the qualitative coding process, including iteration, rater interaction, and reliance on LLM summaries. * Clarify the sequencing of methodological steps and ensure logical dependencies. * Justify dataset selection criteria and report exclusion numbers. * Ensure consistency between research questions and the role of LLMs. * Consider extending the dataset size if feasible through pre-screening. * **Results and Discussion:** * Explicitly discuss novel vs. incremental findings and align with previous empirical work. * Provide concrete examples of implications for practitioners. * Consider adding new research questions and discussions. * Clarify the rationale for using large language models. * **Overall Cohesion:** Improve the integration and cohesion across different methods employed in the study. **Recommended Actions:** 1. **Thoroughly read and understand all reviewer comments.** 2. **Develop a detailed plan to address each comment.** Categorize comments by theme (e.g., Introduction, Methodology, Results, Discussion) to facilitate systematic revision. 3. **Rewrite sections of the manuscript** based on the reviewer feedback, focusing on the identified weaknesses. 4. **Prepare a comprehensive response letter** detailing how each reviewer comment has been addressed. 5. **Ensure the resubmitted manuscript is treated as a NEW submission** but consider disclosing the original submission information and reference number. 6. **Consult empirical research guidelines** (e.g., Paul Ralph et al. 2020) for structuring the revised manuscript and methodology. 7. **Consider creating a methodological diagram** to clarify the workflow. **No Deadline:** The email does not specify a deadline for resubmission. --- Buongiorno a tutti, vi giro la mail ricevuta da JSS. Saluti, Andrea ---------- Forwarded message --------- Da: Journal of Systems and Software <em@editorialmanager.com> Date: lun 19 gen 2026 alle ore 10:59 Subject: Decision on your submission
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] Podcast dottorato
|
||||
todoist-id:: [6fr3FqrHRj6PCjpc](https://todoist.com/showTask?id=6fr3FqrHRj6PCjpc)
|
||||
todoist-project:: #📧EmailsToAnswer
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-desc:: From: raffaele.dambrosio@univaq.it Received: 2026-01-26T11:24:01Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAihJn73AAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- **Task:** Suggest guests for the PhD podcast. **Description:** Raffaele is organizing a podcast series about PhD programs and is looking for guests. He has received suggestions from other program coordinators, but he specifically needs recommendations for guests for the PhD in Computer Science. The aim is to showcase diverse stories, including PhD holders working in academia, outside academia, current PhD students, and colleagues. **Actions to take:** 1. Identify potential guests for the PhD in Computer Science podcast, ensuring a variety of backgrounds and experiences. 2. Compile a list of these individuals and their relevant affiliations/roles. 3. Submit the suggestions to Raffaele. **Deadline:** None mentioned in the email. --- Caro Davide spero che ogni cosa proceda al meglio per te. Ti scrivo in merito al podcast sul dottorato. Come hai potuto evincere dal carteggio con tutti i coordinatori di programmi di dottorato ad UnivAQ, sono state segnalate alcune persone (dottora
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] INFORMAZIONI ESAME
|
||||
todoist-id:: [6frJFWv6c37QjWcc](https://todoist.com/showTask?id=6frJFWv6c37QjWcc)
|
||||
todoist-project:: #📧EmailsToAnswer
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-desc:: From: asia.picuti@student.univaq.it Received: 2026-01-27T20:44:57Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAih8lmvAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Here's a summary of the email and the actionable task: **Task Summary:** Asia Picuti, a student in the Education and Social Services program, needs to take the exam for "Multimediality for Educational Sciences" due to a change in her academic track. She is requesting information on the study materials and exam format. **Actionable Task:** * **Task:** Provide study materials and exam details for "Multimediality for Educational Sciences." * **Details:** Respond to Asia Picuti's email with the required information for the "Multimediality for Educational Sciences" exam. * **Assignee:** (Likely the recipient of the email, the professor or administrator) * **Deadline:** None specified in the email. --- Buonasera , Sono Asia Picuti e frequento il corso di Scienze della formazione e del servizio sociale. Dovendo cambiare ordinamento, devo sostenere l'esame di " multimedialitá per le scienze dell' educazione". Mi potrebbe dire cortesemente il materiale d
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] Certificazione corsi di dottorato non presenti su ESSE3
|
||||
todoist-id:: [6frGFmx63Q8xJ478](https://todoist.com/showTask?id=6frGFmx63Q8xJ478)
|
||||
todoist-project:: #Inbox
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-desc:: From: leonardo.fazzini1@graduate.univaq.it Received: 2026-01-27T15:58:11Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAih8lmlAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Here's a summary of the email and an actionable task description: **Task Title:** Ensure PhD Course Registrations are Completed on ESSE3 **Task Description:** Leonardo Fazzini, a second-year ICT PhD student, is requesting assistance with the registration of two PhD courses on the ESSE3 platform. He completed both courses during his first year: * **Research Methodology** (internal, taught by Prof. Thanh Phuong Nguyen) * **Neural Networks and Deep Learning** (external, taught by Prof. Giorgio Buttazzo at Scuola Superiore Sant'Anna) Leonardo submitted all required documentation for both courses during the transition from his first to his second year, but neither course is currently registered on ESSE3. **Recommended Actions:** * Investigate the status of the course registrations on the ESSE3 platform. * Contact the relevant administrative office or individuals responsible for ESSE3 course registration to understand the delay. * Follow up with the professors or departments involved if further information or documentation is required. * Ensure both "Research Methodology" and "Neural Networks and Deep Learning" courses are officially registered for Leonardo Fazzini on ESSE3. * Confirm with Leonardo Fazzini once the registrations are successfully completed. --- Gentili Professori Di Ruscio e Di Mascio, sono Leonardo Fazzini, dottorando in ICT al secondo anno, con supervisor Giacomo Valente e Luigi Pomante (in cc). Vi scrivo per segnalarvi una questione relativa alla registrazione dei corsi di dottorato. Nel co
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-28]] 6 days late? IEEE Software, SW-2025-10-0161.R1
|
||||
todoist-id:: [6frPc34wCFgXX4Rg](https://todoist.com/showTask?id=6frPc34wCFgXX4Rg)
|
||||
todoist-project:: #Inbox
|
||||
todoist-due:: 2026-01-28
|
||||
todoist-desc:: From: onbehalfof@manuscriptcentral.com Received: 2026-01-28T05:48:37Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAii1IcIAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Here's a synthesized task description and actionable recommendations based on the email: **Task Description:** Finalize and send out the re-review for the paper "Explainer Pattern – A Design Pattern for the Integration of Explanations in Code" (IEEE Software, SW-2025-10-0161.R1) to expedite its publication. **Actionable Recommendations:** * **Review and Finalize Paper:** Prof. Di Ruscio, please review the paper "Explainer Pattern – A Design Pattern for the Integration of Explanations in Code" and make any necessary final adjustments. * **Send Re-review:** Once finalized, please send out the re-review of the paper. **Deadline:** * The email implies urgency, noting that three weeks have passed and a "week late is not a big deal, but it can quickly add up." While no explicit date is given, the context suggests the re-review should be completed as soon as possible. **Recommendation:** Aim to complete and send the re-review within the **next 2-3 days** to align with the implied urgency. --- 28-Jan-2026 IEEE Software, SW-2025-10-0161.R1 "Explainer Pattern – A Design Pattern for the Integration of Explanations in Code" Dear Prof. Di Ruscio: Maybe a week late is not a big deal, but you really have had 3 weeks to finalize this, and it
|
||||
todoist-status:: ◼️
|
||||
@@ -237,4 +237,18 @@
|
||||
todoist-project:: #🎓 Services-PHDICT
|
||||
todoist-due:: 2026-01-31
|
||||
todoist-desc:: From: noreply@cineca.it Received: 2026-01-09T10:34:00Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAifdGzXAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Here's a breakdown of the email and a suggested task: **Email Summary:** The email confirms the registration of a PhD thesis titled "Multi Agent System for Railway Steel Bridges Health Monitoring by Vibration Based Sensory Data and Fuzzy Logic" by Muhammad Asad. You are listed as the supervisor for this thesis. The registration has been completed by ASAD, Muhammad, under category 8.1 Doctoral Thesis, and the assigned handle is 11697/275202. --- **Task Recommendation:** **Task Title:** Confirm PhD Thesis Registration: Multi Agent System for Railway Steel Bridges Health Monitoring **Description:** The registration for the PhD thesis "Multi Agent System for Railway Steel Bridges Health Monitoring by Vibration Based Sensory Data and Fuzzy Logic" by Muhammad Asad has been completed and assigned the handle 11697/275202. This thesis falls under the category of Doctoral Thesis (8.1). **Recommended Actions:** * **Review Thesis Registration:** Verify that all details in the registration are accurate and complete. * **Locate Thesis Repository:** Find where the thesis is stored or linked using the provided handle (11697/275202). * **Acknowledge Supervision:** If required by your institution or department, formally acknowledge your role as supervisor for this registered thesis. * **Follow Up with Student (Optional):** Consider reaching out to Muhammad Asad to congratulate him on the registration and discuss any next steps. **Deadline:** None specified in the email. --- E' stata rivista e inserita la registrazione relativa a: Multi Agent System for Railway Steel Bridges Health Monitoring by Vibration Based Sensory Data and Fuzzy Logic di cui Lei e' relatore. La registrazione ´ stata immessa da ASAD, Muhammad ne
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-31]] [[TOOL DEMO TRACK - MODELS 2026 Organizing Committee]]
|
||||
todoist-id:: [6fQ7HCGxPvcHGHgg](https://todoist.com/showTask?id=6fQ7HCGxPvcHGHgg)
|
||||
todoist-project:: #💺 EditoringChairing
|
||||
todoist-due:: 2026-01-31
|
||||
todoist-desc:: From: lolaburgueno@uma.es
|
||||
todoist-labels:: #goal #logseqed
|
||||
todoist-status:: ◼️
|
||||
- [[2026-01-31]] 🧠 Manage EASE 2026 Leading Reviewer Submission Review Process
|
||||
todoist-id:: [6frGf8cR7g3RFwMg](https://todoist.com/showTask?id=6frGf8cR7g3RFwMg)
|
||||
todoist-project:: #Inbox
|
||||
todoist-due:: 2026-01-31
|
||||
todoist-desc:: Subject: EASE2026 submission assignment (as leading reviewers) Sender: ease2026@easychair.org Weblink: [Outlook](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAih8lmqAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) Content Summary: You are assigned as the Leading Reviewer for papers (62) and (184) in the EASE 2026 conference. Your role involves facilitating the review process by ensuring review quality, initiating and moderating discussions, and writing a meta-review with a recommendation. Subtasks: 1. Check colleagues' reviews for appropriate and constructive language. Request clarifications through EasyChair comments if issues are found. 2. Initiate the discussion starting February 27th, even if some reviews are still missing. 3. Moderate the discussion to help reach a consensus by March 10th. 4. Write a brief meta-review summarizing the discussion and giving a recommendation (accept/reject) for the Program Chairs. 5. Submit your final recommendations by March 10th, AoE. Deadline: March 10th, AoE Labels: ai-generated-main-task
|
||||
todoist-labels:: #ai-generated-main-task
|
||||
todoist-status:: ◼️
|
||||
@@ -25,4 +25,11 @@
|
||||
todoist-id:: [6fhqXvj7Mj8hXmM9](https://todoist.com/showTask?id=6fhqXvj7Mj8hXmM9)
|
||||
todoist-project:: #🎓 Services-PHDICT
|
||||
todoist-due:: 2026-02-02
|
||||
todoist-status:: ◼️
|
||||
- [[2026-02-02]] 🧠 Review and Complete Paper Assignments for EASE 2026 Research Papers Track
|
||||
todoist-id:: [6frFf4WCxMV283m6](https://todoist.com/showTask?id=6frFf4WCxMV283m6)
|
||||
todoist-project:: #📜 REVIEWS
|
||||
todoist-due:: 2026-02-02
|
||||
todoist-desc:: Subject: [EASE 2026] Research Papers Track Paper Assignment Sender: ease2026@easychair.org Weblink: [Outlook](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAih8lmYAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) Summary: You are assigned to review 226 research papers for EASE 2026, with an expected load of 5-6 papers each. Access the submissions via EasyChair for EASE 2026. Main Instructions: - Provide positive and constructive reviews focusing on novelty, significance, soundness, verifiability, transparency, and presentation. - Follow the IEEE Code of Conduct and optionally refer to the Empirical Standards Checklist. - Use the scoring system: strong accept, accept, weak accept, weak reject, reject. Lead Reviewer Responsibilities (if designated): - Initiate and drive the discussion to reach consensus. - Check reviews for issues and request changes. - Write a meta-review summarizing discussion and rationale without revealing reviewer identities. Deadlines (AoE): - Paper assignment: January 27th - Reviews due: February 26th - Online discussion and meta-review: February 27th – March 10th - Notification date: March 13th Assigned Papers: - (46) A framework for Evaluating Bias in LLM-Generated Code - (62) A Universal Textual Merge Strategy Based on Tokens for Version Control Systems - (108) STLGT: A Scalable Trace-Based Linear Graph Transformer for Tail Latency Prediction in Microservices - (118) Sustainability of Open Source Machine Learning Robustness Assessment Tools: A Repository Mining Study - (184) Exploring Creativity in Human–Human-LLM Collaborative Software Design Subtasks: 1. Log in to EasyChair and access assigned submissions. (Due: Jan 27) 2. Review each assigned paper with positivity and constructiveness. 3. Use the scoring system to rate papers. 4. If lead reviewer, drive discussions, check reviews, and write meta-reviews. (Discussion phase: Feb 27 - Mar 10) 5. Submit all reviews by February 26. 6. Participate in online discussions and submit meta-review if applicable between February 27 and March 10. 7. Await notification on March 13. Please ensure to keep all reviews respectful and support your evaluations thoroughly. Contact program chairs Silvia Abrahão and Xin Xia for any questions.
|
||||
todoist-labels:: #ai-generated-main-task
|
||||
todoist-status:: ◼️
|
||||
@@ -4,4 +4,11 @@
|
||||
todoist-project:: #👷 WORK
|
||||
todoist-due:: 2026-02-03
|
||||
todoist-desc:: From: sicurezza.lavoro@strutture.univaq.it Received: 2026-01-13T11:02:45Z ✉: [Web Link](https://outlook.office365.com/owa/?ItemID=AAMkADM1NGNiNjk0LTY0ZGUtNDgzOC04MDM5LWNhODNkYWNjNjU4YwBGAAAAAACT6qp78kRgRKuUMBdWEga%2FBwCOhWlC8F7PRKzlljZYZYQmAAAAAAEMAACOhWlC8F7PRKzlljZYZYQmAAiX6FPeAAA%3D&exvsurl=1&viewmodel=ReadMessageItem) --- Here's a summary of the email and the recommended actions for the task: **Task Summary:** This email is a reminder to a university faculty member that they have not completed the mandatory health and safety training at the workplace. The university provides this training through e-learning and in-person courses. The faculty member needs to complete this training, with a deadline of February 28th. If they have completed similar training elsewhere, they should send their certificates to the provided email address for verification. Failure to complete the training is a legal obligation and can result in sanctions. **Recommended Actions:** * **Action:** Complete mandatory health and safety training for the workplace. * **Details:** This training is a legal requirement and is offered through e-learning and in-person courses by the university. Refer to the university's safety portal for details: [univaq.it](https://www.univaq.it/section.php?id=2001) * **If applicable:** If you have completed this training at other institutions, send your certificates to the sender's email address for verification. * **Deadline:** February 28th --- Gentile docente, da un controllo svolto nel nostro database docenti , non risulta che Lei abbia mai svolto da noi la formazione in materia di salute e sicurezza sui luoghi di lavoro, obbligatoria già al momento della presa di servizio e che va aggiorn
|
||||
todoist-status:: ◼️
|
||||
- [[2026-02-03]] FATE - precedente DRAMA: Nuova Metodologia e Risultati
|
||||
todoist-id:: [6fW295wjFjqGj5c8](https://todoist.com/showTask?id=6fW295wjFjqGj5c8)
|
||||
todoist-project:: #✏️ PAPERS
|
||||
todoist-due:: 2026-02-03
|
||||
todoist-desc:: [https://www.overleaf.com/project/69675da0f0967462b3bd0c9d](https://www.overleaf.com/project/69675da0f0967462b3bd0c9d) [Web Link](https://outlook.office365.com/owa/?ItemID=AAkALgAAAAAAHYQDEapmEc2byACqAC%2FEWg0AjoVpQvBez0Ss5ZY2WGWEJgAIg57bhwAA&exvsurl=1&viewmodel=ReadMessageItem) Okay, here’s a task description for the email “R: Aggiornamento Paper DRAMA: Nuova Metodologia e Risultati,” crafted with actionable steps, aiming to help someone understand and complete the task: **Task Title:** Finalize & Share the DRAMA Paper Update **Description:** This task focuses on finalizing the updated DRAMA paper and ensuring it’s presented effectively to stakeholders. It involves reviewing the document, incorporating feedback, and preparing it for distribution. **Actionable Steps:** 1. **Review the Document:** Carefully read the entire updated DRAMA paper. Pay particular attention to the section regarding [Specifically mention the key section or data point the paper focuses on - e.g., methodology, results, conclusions]. 2. **Gather Feedback:** Share the document with [Assignee - specify who needs to review it - e.g., Team Lead, Senior Analyst]. Actively solicit feedback on clarity, accuracy, and completeness. 3. **Address Feedback:** Respond to each piece of feedback received. Document all changes made based on feedback. Prioritize revisions based on the severity of the feedback. 4. **Incorporate Changes:** Implement the necessary revisions to ensure the document accurately reflects the updated methodology and results. 5. **Draft a Summary/Executive Summary:** Create a concise executive summary highlighting the key takeaways, the updated methodology, and the most significant results (approximately [Specify length – e.g., 1-2 paragraphs]). 6. **Finalize & Format:** Ensure the document is properly formatted, including consistent headings, tables, figures, and citations. 7. **Prepare for Distribution:** Choose the appropriate distribution method (e.g., email, shared drive, presentation). Consider adding a brief introductory paragraph explaining the update. 8. **Proofread:** Conduct a final proofread to catch any errors before final submission. **Priority:** Medium - This task requires focused effort and attention to detail. **Due Date:** [Specify a realistic deadline – e.g., End of Day Tomorrow] **Notes:** If you have any specific areas you’d like me to focus on during the review, please let me know. --- **To help me refine this further and make it *even* better, could you tell me:** - **Who is the intended audience for this task?** (e.g., Team, Management, Clients?) - **What is the *specific* goal of the updated paper?** (e.g., present a new strategy, demonstrate improved efficiency, provide data insights?)
|
||||
todoist-labels:: #outlook365
|
||||
todoist-status:: ◼️
|
||||
@@ -2710,7 +2710,7 @@
|
||||
todoist-project:: #🚀 Projects-EU-MOSAICO
|
||||
todoist-labels:: #deepwork #goal #logseqed
|
||||
todoist-status:: ◼️
|
||||
- [[No due date]] valigia
|
||||
todoist-id:: [6fr9RRQ3wPrrQ4c8](https://todoist.com/showTask?id=6fr9RRQ3wPrrQ4c8)
|
||||
- [[No due date]] [I didn’t expect a free research engine to pair this well with NotebookLM](https://www.makeuseof.com/free-research-engine-stanford-notebooklm/)
|
||||
todoist-id:: [6frPgV5gpx4pFHFg](https://todoist.com/showTask?id=6frPgV5gpx4pFHFg)
|
||||
todoist-project:: #Inbox
|
||||
todoist-status:: ◼️
|
||||
Reference in New Issue
Block a user